A world run by clean energy

Firm, clean energy for Central America, from solar to advanced geothermal.

Fireball develops and owns renewable energy assets in El Salvador: solar with batteries for industry today, the region's first advanced geothermal (EGS) plant tomorrow.

3 phases
One country
15 MW
Firm 24/7 geothermal
2033
Geothermal commercial operation
Why EGS, why now

Growing power demand needs clean, firm energy

Artificial intelligence data center

Global electricity demand is rising faster than in decades, after a long period of slow, predictable growth. Meeting it with clean energy, rather than more fossil fuel, is now the central challenge for grid planners and investors.

Artificial intelligence and data centers are a major driver: they need continuous, high-density power around the clock, a load profile that solar and wind alone cannot serve without storage. Clean, firm power fills that gap.

Electric vehicle charging next to wind turbines

At the same time, transportation is electrifying. As electric vehicle fleets grow, demand shifts from the fuel pump to the grid, and the climate benefit depends on how clean that electricity is.

Geothermal is clean, domestic and always on: very low operating emissions, a small land footprint, and output that does not depend on the weather. Enhanced Geothermal Systems (EGS) bring that clean, firm power to places conventional geothermal could not reach.

Rising
Global electricity demand, after decades of flat growth
Accelerating
AI and data center power consumption
Growing
Electric vehicle fleets shifting load to the grid
Firm
Clean geothermal power available 24/7, regardless of weather
The opportunity

A market that needs cheaper, firmer energy

~2x
Wholesale energy prices in El Salvador doubled in 2026.
30–45%
Savings we offer industry compared with the energy it replaces.
24/7
Geothermal delivers firm power without relying on sun or batteries. It is what continuous industry and data centers ask for.

The 2025–2026 legal framework (renewables promotion law, self-consumption regulation and the Geothermal Law) opens room for new private developers.

Business model

Three phases, one country

  1. Phase 1 · From 2027

    Solar as a service

    Solar-plus-battery systems on the rooftops of industries and free-trade zones. Zero upfront investment for the customer, a fixed monthly fee, operation and maintenance included, and a purchase option. Fireball keeps the assets.

    Target: 20 MWp portfolio
  2. Phase 2 · ≈2029

    Solar plant with batteries

    A 9.9 MW plant with 10 MWh of storage. It sells energy under contract to corporate customers.

    9.9 MW · 10 MWh
  3. Phase 3 · Commercial operation 2033

    Geothermal

    A 15 MW plant with firm 24/7 power and a long-term contract. It uses horizontal drilling, controlled stimulation and fiber-optic monitoring, proven in the U.S.

    15 MW · firm 24/7

Solar builds track record, relationships and cash; geothermal builds long-term value. Each phase sustains itself.

Structure

Each project sits in its own vehicle (SPV), with debt non-recourse to the holding company.

Fireball Holding
Fireball Services
Solar as a service
Fireball Generation
Plants and geothermal
One SPV per projectDebt non-recourse to the holding
Long-term vision

The reference advanced geothermal developer in Central America

After the first plant, the plan is to expand the same geothermal field and add new plants across the region.

HondurasEl Salvador · startGuatemala
Initial phaseRegional expansion
Future lines
Industrial heat
Power for data centers
Thermal storage
Risks

Risks and how we manage them

Geological

The resource does not respond as expected
Mitigation · Staged progress with decision gates, resource-risk insurance or guarantees, and experienced technical partners.

Exploration financing

Mitigation · Venture capital and concessional climate funds dedicated to geothermal. Solar is not used as the main source.

Regulatory and permitting

Mitigation · Formal consultations with authorities before each phase, stability and change-in-law clauses, and IFC environmental and social standards from the start.

Price and market

Mitigation · Long-term fixed-price contracts and customers who need firm 24/7 power.

Customer credit

Mitigation · Credit screening, guarantees and a portfolio diversified by sector.

Induced seismicity

Mitigation · Continuous fiber-optic monitoring, a traffic-light protocol and sites away from active faults.

Construction

Mitigation · Fixed-price turnkey contracts and drillers with a track record.

Each phase has gate conditions; no capital is committed to the next phase without meeting the previous one.

Investment proposal

A staged program with independent vehicles

Illustrative base case.
US$195M
Total program investment (base case)
3
Independent project vehicles
~56% debt · ~39% equity · ~5% grants
Pre-seedOpen
Year:2027
Amount:US$2.5M
Legal structure, first solar contracts, studies
Seed
Year:2028
Amount:US$12M
Solar portfolio and plant development
Series A
Year:2029
Amount:US$9M
Geothermal exploration
Series A-2
Year:2030
Amount:US$9.5M
Test wells and resource validation
Project capital
Year:2031–2032
Amount:US$43M
Construction of the geothermal plant, alongside long-term debt
Open round
Pre-seed US$2.5M (2027)
Request information

We are looking for partners for equity (family offices, climate VC, infrastructure investors) and for project financing (multilateral and development banks, climate funds).

The full financial model, returns and sensitivities are available under a confidentiality agreement.

Milestones

From incorporation to geothermal commercial operation

  1. 2027

    Incorporation, first solar contracts, pre-seed.

  2. 2028

    Growing solar portfolio, seed.

  3. 2029

    Solar plant and geothermal exploration.

  4. 2030

    Resource validation.

  5. 2031–2032

    Financial close and construction.

  6. 2033

    Geothermal commercial operation.

Returns for partners

Timeline, sources of return and value potential

Illustrative base case.
Timeline
2027–2033
From the first solar contract to geothermal commercial operation. From then on, income from long-term contracts.
Early cash flow
From 2027
Solar as a service generates fixed monthly fees from Phase 1, before geothermal matures.
Long-term value
15 MW firm
A 24/7 geothermal asset with a long-term contract, the base to expand the field and add plants across the region.
How value is created at each stage
Pre-seed and seed

Entry at the lowest valuation stage of the program, with a solar portfolio generating cash.

Series A and A-2

Validating the geothermal resource is the main re-rating milestone.

Project capital

Return tied to an operating asset with contracted revenue and non-recourse debt.

Liquidity alternatives considered
Sale of a stake in an SPV
Entry of a strategic investor
Refinancing of the operating asset
Dividends from contracted assets

Expected returns, the distribution schedule and base-case sensitivities are shared under a confidentiality agreement.

Request data room access
Team

Founder

Ludwin De León
Ludwin De León
Founder
Fireball Energy
A world run by clean energy

Request the Investment Memorandum

For inquiries from institutional investors, development banks, and infrastructure funds.

Request more information